CLIENT DESCRIPTION DATE OF START DATE OF FINISH  
PHILIP MORRIS SABANCI INC PHILSA PHASE 3 PROJECTS 15.09.2006 30.06.2007  
AKZO NOBEL DYE INC. EXTENSION PRODUCTION BUILDING 01.10.2006 30.07.2007  
BOSCH HEATING FACTORY ROADS 01.05.2007 30.07.2007  
VESTEL INC. FACTORY BUILDINGS 22.08.2006 30.11.2007  
MAMAK MUNICIPALITY ANKARA MAMAK MUNICIPALITY MEMBRANE CONSTRUCTION 01.02.2007 15.09.2007  
PHILSA PHILIP MORRIS SABANCI INC. NEW CAFETERIA BUILDING CONSTRUCTION 05.02.2007 15.10.2007  
MMO SHOWROOM and CAFETERIA DECORATION 01.03.2007 30.10.2007  
ARKAS HOLDING GAZIEMIR PEUGEOT SHOWROOM AND SERVICE BUILDING 20.04.2007 15.11.2007  
URLA YASEMİN BUILDING COOPERATIVE URLA YASEMİN BUILDING COOP. ROUGH CONSTRUCTION WORK OF 36 VILLAS 30.01.2007        30.11.2007  
9 EYLUL UNIVERSITY FOUNDATION FACULTY OF MEDICINE DEANSHIP AND CLASSROOM BUILDINGS  04. 09.2006        30.11.2007  
KARAOGLU BUILDING MAT. INC BUSINESS CENTER AND WAREHOUSE 10. 01.2007        31.12.2007  
TÜRK TELEKOM A.Ş DEMİRCİ SANTRAL ONARIM VE TADİLAT İŞLERİ 22.11.2007        31.12.2007  
TETRA PAK A.Ş MEVCUT FABRİKA TADİLAT İŞLERİ 20.11.2007         31.12.2007  
VESTEL INC. CONSTRUCTION WORK OF META NİKEL GÖRDES House of Accommodation 20.09.2007         30.12.2007